Scheibe Consulting, LLC, was established in 2011 and has grown to include a group of highly qualified professionals with skills in H&H modeling, FEMA CLOMR/LOMR projects, general civil design, utility design, roadway design, navigation channel design, stable channel design, bridge/culvert design, coastal engineering, dam design, levee design, and construction services.
Scheibe staff have worked on public and private projects including:
- Neches Salt Water Barrier Project, Vidor, TX
- Sims Bayou Federal Flood Control Project, Houston, TX
- Addicks and Barker Reservoir CWMS Program, Houston, TX
- Wharton Co. Drainage Master Plan, Wharton, TX
- Texas City Levee Certification Project, Texas City, TX
- Lower Colorado River Restudy (‘Tri-County Study’), Colorado Co. to West Matagorda Bay, TX
- Lower Nueces River Regional Sediment Management Project, Corpus Christi, TX
- Nueces Bay Rookery Island Restoration Project, Corpus Christi, TX
- Raymondville Drain Federal Feasibility Study, Willacy Co., TX
- Cameron County Drainage District #5 2D Modeling Flood Protection Plan, Harlingen, TX
- Bahia Atascosa National Wildlife Refuge – Ecosystem Restoration Project, Brownsville, TX
- Guadalupe Blanco River Authority Flood Protection Planning Study, TX
- Hays Co. Remapping Study, TX
- Numerous Floodplain Studies for the City of Austin Watershed Protection Department
- N. and S. San Gabriel River Flood Protection Planning Study, Williamson Co., TX
- Nolan Creek Flood Protection Planning Study, Killeen, TX
- San Marcos Flood Early Warning System, San Marcos, TX
- Blanco Gardens Drainage Improvement Project, San Marcos, TX
- Mopac Roadway and Drainage Improvement Project (Slaughter to La Crosse), Austin, TX
- Caltrans High Speed Rail Project, Fresno, CA
Cameron County Drainage District #5 Flooding – June 2019 Event
(Scheibe RAS 2D Model Results)
Nueces Rookery Island Restoration – Island #1 Construction
(Scheibe 12/09/19)

(Scheibe Designed and Provided Construction Phase Services – 2019)
You must be logged in to post a comment.